Posts

Project Management Assessment

Project Management Assessment

 

Activity 1: Both Waterfall (Predictive) and Agile(Adaptive) methodologies are built based upon core tenets.  Describe one core tenet for Waterfall and one core tenet for an Agile methodology of your choice and explain why you feel it is necessary for the methodology.

Activity 2: Case Study Overview: Case Study Attached below. In conventional business and government megaprojects–such as hydroelectric dams, chemical-processing plants, or big-bang enterprise-resource-planning systems–the standard approach is to build something monolithic and customized. Such projects must be 100% complete before they can deliver benefits: Even when it’s 95% complete, a nuclear reactor is of no use. On the basis of 30 years of research and consulting on megaprojects, the author has found two factors that play a critical role in determining success or failure: replicable modularity in design and speed in iteration. The article examines those factors by looking at well-known megaprojects, both successful ones, and cautionary tales.

Paper Requirements: Ques 1:  In the article Agility Hacks, they talk about processes that can be used to “tackle immediate challenges quickly”.  Using your knowledge of Project Management Processes, what is the impact to the organizaton by not using a “formalized process” and what do you feel is the different between an “agility hack” and a hybrid methdology

  1. This is to be in narrative form and should be as thorough as possible.
  2. Bullet points should not be used. 
  3. The work should be at least 2- 2.5 pages in length and 500 words
  4. Times New Roman 12-pt font, double-spaced, 1-inch margins
  5. Utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized.
  6. Do not insert excess line spacing.
  7. APA formatting and citation should be used.

Need within 24 hours and with no plagiarism.

 

Project Management Assessment

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

 

Project Management Assignment

Project Management Assignment

Using your knowledge of Traditional, Agile, and Hybrid answer the following:Agile:

  1. Explain how iterative project processes help expose requirements?
  2. Explain how iterative project process help manage risks associated with changing requirements?
  3. Identify and categorize new projects, products, and organizational risks to which Agile projects are susceptible.
  4. Identify and categorize new projects, products, and organizational risks to which Traditional projects are susceptible.
  5. Describe the characteristics of leadership required in an agile project.  Which characteristics are the same and which are different when leading a waterfall project?

Hybrid

  1. Describe a hybrid project management process?
  2. Describe the benefits to a company for creating a hybrid process?

Traditional

  1. What are the benefits to a company for using a traditional approach in project management?  What are the negatives?
  2. Given your experience and your research, what is the future of project management methodologies in your industry?

Assignment Requirements

  1. The assignment is to answer the question provided above in form.
  2. Where applicable, students can include diagrams if it will help provide a pictorial view of the solution.   
  3. This is to be in narrative form and should be as thorough as possible.
  4. Bullet points should not be used. 
  5. The paper should be at least 3-4 pages in length.
  6. Times New Roman 12-pt font, double-spaced, 1-inch margins
  7. Utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized.
  8. Do not insert excess line spacing.
  9. APA formatting and citation should be used.

 

 

Project Management Assignment

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

Project Management Assessment

Project Management Assessment

Part 1Strategic Planning:Case Study Overview:In conventional business and government megaprojects–such as hydroelectric dams, chemical-processing plants, or big-bang enterprise-resource-planning systems–the standard approach is to build something monolithic and customized. Such projects must be 100% complete before they can deliver benefits: Even when it’s 95% complete, a nuclear reactor is of no use. On the basis of 30 years of research and consulting on megaprojects, the author has found two factors that play a critical role in determining success or failure: replicable modularity in design and speed in iteration. The article examines those factors by looking at well-known megaprojects, both successful ones, and cautionary tales.Case Study Link

Using the megaproject case study  answer the following:You have just read an awesome article about megaprojects and how to make them more modular.  You are new to an organization managing their Portfolio Management Office (PMO) and have several projects that you feel meet the criteria of a “megaproject”.  Given what you have learned from this article and your experience managing projects identify the following:

  1. What would be your suggested approach to managing a megaproject?
  2. What are the risks with your approach?

Part 2Using your knowledge of stakeholders, stakeholder management, and the Megaproject case studies linked above, answer the following:

  1. Develop a stakeholder matrix for a mega project
  2. Describe stakeholder issues that could arise when managing a megaproject.
  3. Identify 2-3 stakeholders and their role within a megaproject.

Assignment Requirements:

  1. The assignment is to answer the question provided above in form. 
  2. This is to be in narrative form and should be as thorough as possible.
  3. Bullet points should not be used. 
  4. The paper should be at least 1.5 – 2 pages in length.
  5. Times New Roman 12-pt font, double-spaced, 1-inch margins
  6. Utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized.
  7. Do not insert excess line spacing.
  8. APA formatting and citation should be used.

 

 

Project Management Assessment

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

Project Management Assignment

Project Management Assignment

Overview

The purpose of this activity is to expose you to the Microsoft Project tool for the purpose of developing a project plan and Gantt chart for a hypothetical 30-day HOME HOBBY project. The Project will be building a home gym. This activity consists of two parts:

Part 1: Project Introduction, or Project Plan

You will write a 3–5-page document outlining the project specifics, such as its key objectives and scope, functional and technical requirements, key components, etc.

Part 2: Gantt Chart

You will use Microsoft Project to create a Gantt chart for your hobby project. Download Microsoft Project to your computer if you don’t already have it installed and familiarize yourself with its features.

  • You are to create or assume all necessary assumptions to successfully complete this activity.

Instructions

Part 1: Project Introduction or Project Plan

Write a 3–5-page project plan in which you:

  1. Document the hobby project’s key objectives and scope.
  2. Develop the hobby project’s functional and technical requirements.
  3. Design the hobby project’s components, including size, shape, and quality.
  4. Implement the project according to the chosen design and components.
Part 2: Gantt Chart

Use Microsoft Project to create a Gantt chart identifying the major and minor tasks, illustrating dependency relationships between activities.

Formatting

  • The preferred method is for the project plan portion of your activity to be typed, double-spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
  • Include a cover page containing the assignment title, your name, your professor’s name, the course title, and the date. The cover page is not included in the required page length.
  • You are not required to include a source list page for this introductory activity. You will, however, be responsible for citing sources and including a source list page for all of the course project deliverables.

 

 

 

Project Management Assignment

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

 

Project Management

t

Project Management Presentation

Overview

For this assignment, you will demonstrate your knowledge of the role of project management in information systems and why it is such an important component.Imagine you are currently working in an information systems field at a small company in which projects have been typically managed by the senior employee working on them without any real plan or specific direction, and each employee has a very different style of management (or lack thereof). The company has recently considered improving in this area and might even consider hiring a project manager or adopting some kind of software or process for managing the project it takes on. There is obviously a need for change, but not everyone is on board. In an effort to help everyone see the value of project management improvements, you have been asked to create a presentation on why the company might need a more formalized process for project management. You will need to explain what project management really and why it is such a significant part of information systems work. You will also need to make some recommendations on what types of project management strategies the company might want to adopt.

Instructions

Your presentation should include:

  • 10–12 slides.
  • A title slide (not included in the required number of slides).
  • A reference slide (not included in the required number of slides).
  • Three examples of some of the pitfalls that occur in projects when there is no project management.
  • Three examples of how project management can prevent pitfalls when there is no project management.
  • Three examples of how using project management can benefit the creation of an information system.
  • A detailed list of at least three recommendations for project management tools or strategies the company should adopt and an explanation of why those were chosen.
  • Use the Basic Search: Strayer University Online Library to find at least three academic resources. Note: Wikipedia and similar Websites are not considered quality references.

This course requires the use of Strayer Writing Standards. For assistance and information, please refer to the Strayer Writing Standards link in the left-hand menu of your course. Check with your professor for any additional instructions.The specific course learning outcome associated with this assignment is:

  • Explain how project management is used to enhance productivity and optimize an organization’s resources.

 

 

 

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

 

Project Management Assignment

Project Management Assignment

In a short paper (2-3 pages), please address each of the topics below with a 2-3 paragraph narrative for each section.

Course Content: Describe the most important aspects of this course for you with respect to the content that was covered or activities in which you participated. Discuss the relevance and value or the practicum assignment with respect to your knowledge acquisition.
Application of Course Content: Describe how you applied what you learned in this course at your workplace. Discuss how this course may have impacted your specific job, techniques you used at work, or other relevant aspects that show how what you learned was linked to your job.
Job Experience Integration: Describe how your work experiences were used in the classroom and attributed to your performance in the course. Discuss how integrating your work experiences in class activities assisted in understanding topics discussed within the course.
topics:

Projects in Contemporary Organizations

Strategic Management and Project Selection

The Project Manager, Managing Conflict and the Art of Negotiation

The Project in the Organizational Structure

Project Activity and Risk Planning

Budgeting: Estimating Costs and Risks,

Project Scheduling

Resource Allocation

Monitoring and Information Systems

 

 

 

Project Management Assignment

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

 

Project Management Assignment

Project Management Assignment

Unlimited Attempts AllowedAvailable after Nov 3, 2022 12:00amAvailable after Nov 3, 2022 12:00amDetails

Due: 12/01/2022

Chapter: 1-12

Worth: 15 points

Assignment: Complete both a set of business management plans and a Microsoft Project for a  project

Scenario:

  • Base the assignment on a fictional business that has its own in-house development staff
  • The project should be sufficiently large/complex so that it will take between 9-12 months to complete
  • Your choice on the numbers/types of employees… but I’m expecting around a dozen or so
  • Use the traditional SDLC model for development… so most likely 6 top-level summary tasks
  • The vast majority of the costs should be labor, but should contain some non-labor costs

Requirements: There are two parts:

Part 1 – Create a single Word document to cover the following:

  • Do NOT use the same scenario as Assignment 6 (This would confuse the plagiarism checker)
  • The Project Charter
  • A Cost Management Plan
  • A Quality Management Plan
  • A Human Resources Management Plan
  • A Communications Management Plan
  • A Risk Management Plan
  • Paraphrase, do not copy! No more than 35% of the content can be copied

Note: I’m expecting this part of the assignment to be about 10-15 single-spaced pages total

Part 2 – The Microsoft Project document

  • Multiple levels of Work Breakdown Structures
  • Resource table by employee name and some material
  • Full cost per WBS
  • Full work schedule per WBS (without over-allocating employees)
  • Create a Tracking Gantt with some schedule slippage and task completion
  • Create a Earned Value Management report with a report date about 1/2 way through the project

Expectations: A two files that contains the two parts (a DOCX file and a MPP file) Yes, I want you to submit 2 files for this assignment

Instructions: Submit your files using the naming convention in the syllabus, for example:

 

 

Project Management Assignment

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

Project Management Analysis

Project Management Analysis

Unlimited Attempts AllowedAvailable after Nov 3, 2022 12:00amAvailable after Nov 3, 2022 12:00amDetails

Due: 12/01/2022

Chapter: 1-12

Worth: 15 points

Assignment: Complete both a set of business management plans and a Microsoft Project for a  project

Scenario:

  • Base the assignment on a fictional business that has its own in-house development staff
  • The project should be sufficiently large/complex so that it will take between 9-12 months to complete
  • Your choice on the numbers/types of employees… but I’m expecting around a dozen or so
  • Use the traditional SDLC model for development… so most likely 6 top-level summary tasks
  • The vast majority of the costs should be labor, but should contain some non-labor costs

Requirements: There are two parts:

Part 1 – Create a single Word document to cover the following:

  • Do NOT use the same scenario as Assignment 6 (This would confuse the plagiarism checker)
  • The Project Charter
  • A Cost Management Plan
  • A Quality Management Plan
  • A Human Resources Management Plan
  • A Communications Management Plan
  • A Risk Management Plan
  • Paraphrase, do not copy! No more than 35% of the content can be copied

Note: I’m expecting this part of the assignment to be about 10-15 single-spaced pages total

Part 2 – The Microsoft Project document

  • Multiple levels of Work Breakdown Structures
  • Resource table by employee name and some material
  • Full cost per WBS
  • Full work schedule per WBS (without over-allocating employees)
  • Create a Tracking Gantt with some schedule slippage and task completion
  • Create a Earned Value Management report with a report date about 1/2 way through the project

Expectations: A two files that contains the two parts (a DOCX file and a MPP file) Yes, I want you to submit 2 files for this assignment

Instructions: Submit your files using the naming convention in the syllabus, for example:

 

 

Project Management Analysis

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

Project Management assignment

Project Management assignment

Assignment Details

After completing any project, it is important to conduct a review of the project to ensure that all activities have been completed and delivered in scope. Reviews also help gather lessons learned for future project managers.

Remember that a project is temporary in that it has a defined beginning and end, with a defined scope. It is unique in that it is not a routine operation, but a specific set of operations designed to accomplish a single goal. For example, your involvement in this course can be viewed as a project: it has a definite beginning and end, it has a defined scope (the syllabus), and it is designed to accomplish a single goal (to provide you with an overview of project management).

Your final assignment for this course will be to conduct a project evaluation as part of its closeout. You are to create a PowerPoint presentation of at least 8 slides. In your presentation, you will perform a review of this course (the course represents the project, and the course syllabus represents the project plan and the instructor represents the project manager). Your presentation should apply closeout best practices and should capture lessons learned.

You may use any checklists and templates from your text or find them online. You are free to be creative with this assignment. Be sure to cite your sources (if applicable) using APA. Include your references and in-text citations.

Submitting your assignment in APA format means, at a minimum, you will need the following:

  • Title slide: Remember the running head. The title should be in all capitals.
  • Length: 8 slides minimum
  • Body slides: This begins on the slide following the title slide and must be double-spaced (be careful not to triple- or quadruple-space between paragraphs). The typeface should be 12-pt. Times Roman or 12-pt. Courier in regular black type. Do not use color, bold type, or italics, except as required for APA-level headings and references. The deliverable length of the body of your presentation for this assignment is 8 slides. In-body academic citations to support your decisions and analysis are required. A variety of academic sources is encouraged.
  • Reference slide: References that align with your in-body academic sources are listed on the final slide of your presentation. The references must be in APA format using appropriate spacing, hanging indent, italics, and uppercase and lowercase usage as appropriate for the type of resource used. Remember, the Reference slide is not a bibliography but a further listing of the abbreviated in-body citations used in the paper. Every referenced item must have a corresponding in-body citation.

 

 

 

 

Project Management assignment

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.

Project Management report

Project Management report

Assignment Details

Projects of all sizes may seem daunting at first. Breaking the project down into smaller, more manageable pieces allows you to develop an achievable plan for completing the project. The work breakdown structure (WBS) is one of the tools that you can use to outline your project into smaller, more manageable pieces called work packages.

Refer to Case 4.1 of your text. In this case, Brandon has been chosen to chair the 5K charity run for his fraternity, and you are presented with the details of this project. In a 5-page report, you should address the following:

  • How would developing a WBS help to alleviate Brandon’s problems during the initial meeting? How can the WBS be used to organize and plan the project?
  • Describe the process for creating the WBS.
  • Create a list of the major deliverables for this project, and use them to develop a draft WBS with at least 3 levels of detail.
  • Are there any interdependencies that need to be considered and, if so, which ones?
  • Assign cost and activity durations to the work packages (these may be made up).
  • Use either a top-down or a bottom-up approach to determine the overall cost of the project and discuss the approach used.

Be sure to cite your sources using APA; include your references and in-text citations.

Use this template to complete this assignment.

Submitting your assignment in APA format means, at a minimum, you will need the following:

  • Title page: The title should be in all capitals.
  • Length: 5 pages minimum
  • Body: This begins on the page following the title page and abstract page and must be double-spaced (be careful not to triple- or quadruple-space between paragraphs). The typeface should be 12-pt. Times Roman or 12-pt. Courier in regular black type. Do not use color, bold type, or italics, except as required for APA-level headings and references. The deliverable length of the body of your paper for this assignment is 5 pages. In-body academic citations to support your decisions and analysis are required. A variety of academic sources is encouraged.
  • Reference page: References that align with your in-body academic sources are listed on the final page of your paper. The references must be in APA format using appropriate spacing, hanging indent, italics, and uppercase and lowercase usage as appropriate for the type of resource used. Remember, the Reference page is not a bibliography but a further listing of the abbreviated in-body citations used in the paper. Every referenced item must have a corresponding in-body citation.

 

 

 

 

Project Management report

Create an order via https://peakassignments.com/order if you need work on such topic and many more from different disciplines.